CH / EN

Introduction to

Parent Companies

CRRC Nanjing Puzhen Co., Ltd

About

Learn more from our official

account on WeChat!

Email:
info@pats-crrc.com

 

Partner website: 

https://www.alstom.com/ http://www.crrcgc.cc

 

As a core subsidiary of CRRC, CRRC Nanjing Puzhen Co., Ltd is mainly specialized in the manufacture of urban rail vehicles, inter-city trains, modern trams, railway coaches and major core parts, etc. The company is a professional researcher, integrated supplier and solution provider in domestic railway passenger transport and urban rail transit equipment.

Alstom

Address

Service

© 2018 - 2020 Business UI Kit. All right recived     皖ICP备18011413号-1

Leading societies to a low carbon future, Alstom develops and markets mobility solutions that provide the sustainable foundations for the future of transportation. Alstom’s products portfolio ranges from high-speed trains, metros, monorail, trams to integrated systems, customised services, infrastructure, signalling and digital mobility solutions.150,000 vehicles in commercial service worldwide attest to the company’s proven expertise in project management, innovation, design and technology. Following the acquisition of Bombardier Transportation on January 29, 2021, the combined sales of the new group reached EUR 14 billion in the 12 months ending March 31, 2021. Headquartered in France, Alstom currently operates in 70 countries and employs 70,000 people.

 

RODUCTS

Straddle-monorail project -- Wuhu Line 1 and Line 2 phase I 

Page view:

Wuhu Line 1 is 30.489 kilometers in length, comprising 0.057 kilometers of underground line and 30.432 kilometers of ground& overhead line. There are 25 stations in total, all of which are elevated, among which there are 3 transfer stations, namely Beijing Road Station (transfer to Line 2), Yijiang Station (transfer to Line 3), and Baima Mountain Station (transfer to Line R2). There are 2 contact lines across the line. The line connecting with Line 2 is set up at Beijing Road Station. The line connecting with Line 3 will be located at.

Wuhu Line 2 phase I is 15.733 kilometers in length with 11 stations (10 elevated stations, 1 underground station) and 3 transfer stations, namely Beijing Road Station (transfer to Line 1), Yijiang Road Station (transfer to Line R3), and Government Affairs Center Station (transfer to Line 3). The maximum station spacing is 3.07kilometers (from Wuhu Railway Station to Jiujiang South Road Station). The minimum station spacing is 0.810 kilometers (from Government Affairs Center Station to Heqing Road Station). The average station spacing is 1.589 kilometers. The underground line is 0.757 kilometers and the ground&overhead line is 14.976 kilometers, accounting for 95% of the length of the main line.

Wuhu Line 1 - 28 trains of 6 cars (monorail)

Wuhu Line 2 phase I - 18 trains of 4 cars (monorail)

Contact Us

CRRC PUZHEN ALSTOM TRANSPORTATION SYSTEMS LIMITED

Contact: Ms. Yang

Phone: 0553-5809188

Mailbox: idtet@idtet.com

Address: No.69, Mengxi Road, Wuhu Economic and Technological Development Zone