+
  • ELYs1gg2QX2D8UxrsTBtNw(139).png

Shanghai Line 8 phase 3(APM)

Thephase3ofShanghaiLine8extendsfromShenduRoadStationtoHuizhenRoadStation,whichconnectswiththephase2ofLine8.Thetotallengthoftheelevatedlineisapproximately6.689kmwith6stations,andtheaveragestationspacin


Product Description

  The phase 3 of Shanghai Line 8 extends from Shendu Road Station to Huizhen Road Station, which connects with the phase 2 of Line 8. The total length of the elevated line is approximately 6.689km with 6 stations, and the average station spacing is 1260m. The maximum station spacing between Shendu Road Station and Sanlu Road Station reaches 1980.177m. The minimum station spacing between Mingrui Road Station and Puhang Road Station reaches 805.139m.

 

  There were 11 trains with passengers on board during trial operation.