Straddle-monorail project -- Wuhu Line 1 and Line 2 phase I


Wuhu Line 1 is 30.489 kilometers in length, comprising 0.057 kilometers of underground line and 30.432 kilometers of ground& overhead line. There are 25 stations in total, all of which are elevated, among which there are 3 transfer stations, namely Beijing Road Station (transfer to Line 2), Yijiang Station (transfer to Line 3), and Baima Mountain Station (transfer to Line R2). There are 2 contact lines across the line. The line connecting with Line 2 is set up at Beijing Road Station. The line connecting with Line 3 will be located at.

Wuhu Line 2 phase I is 15.733 kilometers in length with 11 stations (10 elevated stations, 1 underground station) and 3 transfer stations, namely Beijing Road Station (transfer to Line 1), Yijiang Road Station (transfer to Line R3), and Government Affairs Center Station (transfer to Line 3). The maximum station spacing is 3.07kilometers (from Wuhu Railway Station to Jiujiang South Road Station). The minimum station spacing is 0.810 kilometers (from Government Affairs Center Station to Heqing Road Station). The average station spacing is 1.589 kilometers. The underground line is 0.757 kilometers and the ground&overhead line is 14.976 kilometers, accounting for 95% of the length of the main line.

Wuhu Line 1 - 28 trains of 6 cars (monorail)

Wuhu Line 2 phase I - 18 trains of 4 cars (monorail)