The2.6-kmAPMloopatHKIA3RSconnectsAIS(nearTerminal2)andTRC–Eastwithtwostations,threetracksandadepot.TheAPMlineisscheduledtobeoperatedbytheendofJune,2024with6trainsof6cars(withemergencyevacuationpathsbe


Product Description

  The 2.6-km APM loop at HKIA 3RS connects AIS (near Terminal 2) and TRC –East with two stations, three tracks and a depot. The APM line is scheduled to be operated by the end of June, 2024 with 6 trains of 6 cars (with emergency evacuation paths between two adjacent cars and shield doors between the first car and the remaining 5 cars of each train);